Infor VISUAL 8 or earlier: moving a 20 to 200 person job shop to ERPNext

Short answer

Infor’s own VISUAL Product Lifecycle Policy (May 2023 edition) shows VISUAL 8.0.0 Mainstream Maintenance ended March 31, 2021 and Extended Maintenance ended March 31, 2023. VISUAL 7.0 and 7.1 left Mainstream on December 31, 2017, with no Extended option. For all of them, Sustaining Maintenance continues with an end date “to be determined”: you keep access to pre-existing fixes and support staff, but no new fixes, updates or regulatory changes. The same policy shows VISUAL 9.0.8 Extended Maintenance ending December 31, 2026, so 9.x sites are next. If you run a 20 to 200 person job shop on VISUAL 8 or earlier, you are choosing between a VISUAL 10 (or later) upgrade, a move to Infor’s cloud, and a different ERP. ERPNext (open source, GPL-3.0, no licence fee) maps cleanly to VISUAL’s parts, Engineering Masters, work orders and labour reporting. The honest gap is scheduling: VISUAL offers finite and drum-buffer-rope scheduling, while ERPNext schedules operations against workstation hours without a graphical finite scheduler. Infor is quote-only, so we give no Infor estimate.

Choosing a platform? Get a free 30-minute advisory call.

Who this guide is for

This guide is for owners, operations managers, controllers and IT leads at order-driven job shops with roughly 20 to 200 people that still run Infor VISUAL 8.0.0, 7.x or older on their own servers. Typical VISUAL sites make parts to customer drawings, quote most jobs, run a handful to a few dozen machines and live or die by on-time delivery. Infor’s own Infor VISUAL product page describes that market: “order-driven manufacturing”, finite or drum-buffer-rope (DBR) scheduling, estimate, actual and projected job costs, and shop-floor automation.

We implement ERPNext, so read our view with that in mind. For a lot of VISUAL shops, upgrading VISUAL is the right answer, and we say where below. This guide is for the shops that have been putting off an upgrade for years, are now running a release with no new fixes, and want to know whether an open-source ERP could run the shop instead.

It is part of our series on legacy ERP deadlines; the legacy ERP end-of-support hub lists every vendor date we have confirmed. If you are weighing other job shop systems, our Epicor Kinetic on-premises guide covers a similar audience.

Sources, checked on Nov 17, 2026: the Infor VISUAL Product Lifecycle Policy (Infor PDF, May 2023 edition, hosted by an Infor partner) (we compared it with the 2018 edition of the same Infor policy (partner-hosted)), the Infor VISUAL product page, the Frappe Cloud pricing page and Frappe Cloud server plans page, the ERPNext repository on GitHub and the ERPNext documentation linked in each section.

About the source

Infor publishes the VISUAL lifecycle policy to customers through its support knowledge base (the document cites Infor Support Knowledgebase #1116381). The copy we cite is hosted by an Infor partner, but it is an Infor document: Infor branding and copyright, Infor’s document code INFDTP2070671-en-US-0523-11, and Infor’s legal note. We could not find a public copy on infor.com, so check the current version in Infor’s support portal before you rely on any date. Infor also says the policy “is not a contractual document”; your maintenance contract governs.

What Infor’s lifecycle policy actually says

VISUAL releaseGeneral availabilityEnd of MainstreamEnd of ExtendedEnd of Sustaining
VISUAL 10.0.0Dec 14, 2020To be determinedTo be determinedTo be determined
VISUAL 9.0.8 (9.0.0 GA)May 19, 2017Dec 31, 2024Dec 31, 2026To be determined
VISUAL 8.0.0Aug 25, 2015March 31, 2021March 31, 2023To be determined
VISUAL 7.1.xMay 22, 2012Dec 31, 2017Not availableTo be determined
VISUAL 7.0.0Jan 14, 2011Dec 31, 2017Not availableTo be determined
VISUAL 6.5.xJan 2, 2006April 30, 2014Not availableTo be determined
VISUAL 6.1.x to 6.4.1Feb 8, 2000Jan 2, 2006Not availableTo be determined

Source: the VISUAL ERP product support schedule in the Infor VISUAL Product Lifecycle Policy (Infor PDF, May 2023 edition, hosted by an Infor partner), checked Nov 17, 2026. One point to know: the 2018 edition of the same policy showed VISUAL 8.0.0 Mainstream ending December 31, 2019 and Extended ending December 31, 2021. The later edition moved both dates out by 15 months. We use the later edition. Either way, VISUAL 8.0.0 has been past Extended Maintenance since 2023 at the latest.

What each stage gives you

StageFixes and updatesRegulatory and tax updatesSupport access
MainstreamPriority 1 and 2 fixes, updates, regulatory and statutory enhancements for released localizationsYesInfor support portal and staff
Extended (paid, when available)Priority 1 (critical) onlyRegulatory updates at Infor’s discretion; no regulatory enhancementsInfor support portal and staff
SustainingAccess to pre-existing fixes only; no new fixes or updatesNoInfor support portal and staff

The policy says Sustaining Maintenance continues “for a period of time to be determined by Infor” and “may require payment of an additional fee, in Infor’s sole discretion”. In practice, that means a VISUAL 8 or 7 site can still log calls and download old fixes, but nothing new will be built for its release: no new tax or payroll changes, no fixes for new operating system or database problems, and no certification with newer third-party products.

Get a tailored shortlist and pricing review

Share your work email and we'll send you a replacement shortlist and cost review tailored to your user count and requirements. A member of our ERP team prepares it personally.

What this means for a job shop on VISUAL 8 or earlier

Nothing switches off. VISUAL 8 will keep quoting, releasing work orders and posting labour tomorrow. The risk is slower and quieter:

  • Infrastructure drift. Your VISUAL release was certified against the Windows, SQL and client versions of its day. Each server refresh or security policy change becomes a test you run yourself.
  • No new fixes. If you hit a defect in costing or scheduling, the fix is only available in a later release, so the answer from support is usually “upgrade”.
  • Regulatory changes. Tax, e-invoicing or payroll changes in your country will not be added to your release.
  • People risk. The person who understands your VISUAL customisations, macros and reports is often one person. Plan for the day they leave.

Count the options honestly. If you upgrade within VISUAL, you go to VISUAL 10 or later. The policy shows VISUAL 9.0.8 reaching the end of Extended Maintenance on December 31, 2026, so upgrading to 9 now would put you straight back into the same position. If you leave VISUAL, a good ERP replacement for a job shop of this size usually takes months of preparation and a clean cut-over at a period end, so start early.

Your options

OptionWhat it involvesBest when
Upgrade to the current VISUAL releaseSame product, data and terminology; Infor or a VISUAL partner runs the upgradeYou are happy with VISUAL, your customisations are modest and your team knows the product
Move to an Infor cloud offeringInfor-hosted, Infor-updated; ask Infor which cloud product fits your shopYou want the vendor to run updates and hosting, and you are comfortable with SaaS
Stay on VISUAL 8 or 7 on SustainingKeep running; pre-existing fixes onlyShort term only, while you plan; not a strategy
Move to ERPNextOpen-source ERP with manufacturing, inventory, purchasing, sales and accounting; self-host or use Frappe CloudYou want to own the system, avoid per-user licence growth, and your scheduling can live with workstation-based capacity planning

Infor does not publish VISUAL licence, maintenance or cloud prices on the pages we checked, so we give no Infor estimate. Ask for a written upgrade quote and a cloud quote, and compare both with an ERPNext proposal over five years.

How VISUAL concepts map to ERPNext

VISUAL and ERPNext describe the same job shop in slightly different words. This table is the starting point for every VISUAL migration we scope.

In VISUALIn ERPNextNotes
Part master (purchased and fabricated parts)Item (ERPNext Item documentation), with UOMs, item groups and default warehousesClean obsolete parts first; decide which parts are stock items
Engineering Master (standard method: operations plus material requirements)Bill of Materials with an operations table (ERPNext Bill of Materials documentation)A BOM can pull its operations from a Routing
Routing steps on a standard methodRouting (ERPNext Routing documentation) and Operations (ERPNext Operation documentation)Routing stores operations with hourly rate, operation time and batch size
Shop resources (machines, work centres, outside services)Workstations (ERPNext Workstation documentation)Working hours, holiday list, operating cost components, production capacity
Work order (job) with operations and requirementsWork Order (ERPNext Work Order documentation)Fetches operations and raw materials from the BOM; can be created from a Sales Order
Labour tickets, clock-on and clock-off by operationJob Card time logs (ERPNext Job Card documentation)One Job Card per operation, created when the Work Order is submitted
Finite or DBR schedule, Manufacturing WindowCapacity planning against workstation hours (ERPNext Capacity Planning documentation), Plant Floor view (ERPNext Plant Floor documentation)The main fit test; see the next section
Outside service operationsSubcontracting (ERPNext subcontracting documentation)Test how your outside processing is bought and received
Quotes and estimatesQuotation (ERPNext Quotation documentation)Estimating from a standard method needs a defined process; test it
Inspection and qualityQuality Inspection (ERPNext Quality Inspection documentation), including in-process checks from a Job CardOperation-level templates are set on the Operation
TraceabilityBatch and serial numbers (ERPNext Batch documentation; ERPNext Serial No documentation)Decide what you must trace before migrating

Two practical notes. First, ERPNext’s Routing documentation says the operating cost is calculated from the hourly rate and the operation time, so get your workstation rates right before you compare estimated costs with VISUAL. Second, routings can carry a Sequence ID, and ERPNext says it will throw a validation error if someone tries to complete an operation on a Job Card before the operations that precede it. That gives you enforced operation order on the shop floor.

Shop-floor scheduling: the honest fit test

Scheduling is where VISUAL shops are most attached to their current system, and with good reason. Infor’s product page lists finite and DBR scheduling, a “what-if” delivery calculation and the Manufacturing Window. If your planners run what-if scenarios every morning and promise dates from the schedule, treat scheduling as the first test, not the last.

Here is what ERPNext documents:

  • Workstation working hours. Each workstation has working hours (including shifts) and a holiday list. When a Work Order is scheduled, ERPNext checks the workstation’s availability against those hours (ERPNext Workstation documentation).
  • Capacity planning on submission. When a Work Order is submitted, its operations are allocated to workstations. ERPNext’s documentation says each operation should start and end on the same day; long operations need to be split, or you enable overtime in Manufacturing Settings (ERPNext Capacity Planning documentation; ERPNext Manufacturing Settings documentation).
  • Production capacity. A workstation can hold a production capacity: the number of jobs that can run at the same time.
  • Plant Floor. A visual view of machine and workstation status, stock on the floor and Job Cards (ERPNext Plant Floor documentation).
  • Downtime Entry. Records machine downtime in minutes, so you can see which machines need maintenance (ERPNext Downtime Entry documentation).
  • Production Plan. Pulls demand from sales orders and creates Work Orders and material requests, including sub-assemblies (ERPNext Production Plan documentation).

What we did not find in ERPNext’s documentation is a graphical finite scheduler with drag-and-drop resequencing or a drum-buffer-rope method. So the test is simple. Take two weeks of your real work orders, load them into an ERPNext trial with your real workstations and hours, and ask your scheduler three questions: do the dates make sense, can I see the bottleneck, and can I re-sequence quickly when a hot job arrives? If the answer is yes, ERPNext is a real candidate. If your shop runs on DBR buffers and daily what-if runs, you will either keep a separate scheduling tool, build one, or stay with VISUAL.

Do not skip this

We have seen job shops move ERP and then run the floor from a spreadsheet because the new schedule did not match how they work. Decide before you sign anything how scheduling will be done on day one.

Job costing and quoting

VISUAL’s strength is the comparison between estimated, actual and projected cost on a work order, which Infor’s product page highlights. In ERPNext the pieces are:

  • Estimated operating cost from workstation hourly rates and operation times on the BOM and Routing.
  • Material cost from the BOM, valued by your stock valuation method.
  • Actual labour time from Job Card time logs, and material actually transferred and consumed through Stock Entries (ERPNext Stock Entry documentation).
  • Projects, if you want a job-level view across several work orders, with Timesheets for non-production time (ERPNext Project documentation; ERPNext Timesheets documentation).

Test it with real jobs. Take five closed VISUAL work orders, two that made money and three that did not, and rebuild them in ERPNext. If the cost picture you get is close enough to drive quoting decisions, you are fine. If your estimators rely on VISUAL’s variance reports in a particular layout, budget for report building in ERPNext. That is normal work, not a blocker.

Getting data out of VISUAL 8

A VISUAL migration is a data job more than a software job. Plan to move:

VISUAL dataERPNext targetHow
Parts, UOMs, vendors, customers, contactsItems, UOM conversions, suppliers, customers, addressesExport to spreadsheets, clean, load with Data Import (ERPNext Data Import documentation)
Engineering Masters for active partsBOMs with operations, Routings, WorkstationsOnly parts you will make again; rebuild rather than copy every revision
Open work ordersWork Orders at the right stage, or finish in VISUALMost shops finish open jobs in VISUAL and start new ones in ERPNext
Open customer and purchase ordersSales Orders and Purchase Orders (ERPNext Sales Order documentation; ERPNext Purchase Order documentation)Freeze changes during cut-over
Stock on hand by warehouse and locationOpening Stock Reconciliation per warehouse (ERPNext Stock Reconciliation documentation)Count high-value material before go-live
Open receivables and payablesOpening invoices and balances (ERPNext opening balance documentation)Reconcile to your aged reports
General ledgerOpening trial balance on a chart of accounts (ERPNext Chart of Accounts documentation)Keep VISUAL read-only for history

Do not plan to load years of closed work orders and labour history into ERPNext. Keep the VISUAL database, or a read-only copy of it, available for audits, warranty questions and repeat-order lookups, and move masters, open items and balances. Agree that history cut-off with your accountant and your quality manager before you start, not during cut-over week.

If you have custom VISUAL macros or reports, list them early and sort them into must-have on day one, needed within a month, and probably unused. In our experience the third group is larger than people expect.

Costs: what is published

ItemUSD (published)GBPSource
Infor VISUAL upgrade, licences, maintenance, cloudQuote only; no estimate givenQuote onlyInfor VISUAL product page
ERPNext softwareNo licence fee (GPL-3.0)No licence feeERPNext repository on GitHub
ERPNext on Frappe Cloud, site plansFrom $5 per monthAbout £3.78 (indicative)Frappe Cloud pricing page
ERPNext on Frappe Cloud, dedicated serversFrom $40 per monthAbout £30.25 (indicative)Frappe Cloud server plans page

Frappe Cloud publishes USD prices: site plans from $5 a month (about £3.78) and servers from $40 a month (about £30.25), checked on Nov 17, 2026. The GBP figures are indicative conversions, not Frappe prices.

Indicative GBP conversions use the Bank of England daily spot rate (series XUDLUSS) of US$1.3222 per £1 for 13 Nov 2026, the latest published figure when we checked on Nov 17, 2026. They are not official UK prices: Frappe does not publish a GBP list price for these plans, and your invoice currency, rate and VAT treatment may differ.

Hosting is the smallest line in either budget. For ERPNext, the real costs are data cleansing and migration, rebuilding Engineering Masters as BOMs and routings, reports, integrations (CAD, shipping, EDI, payroll) and training. For a VISUAL upgrade, they are the upgrade service, any re-licensing, re-testing customisations and training on the new release. Ask for both in writing before you compare, and do not let anyone compare licence fees alone.

Where staying with Infor is the better answer

  • Your planners depend on finite or DBR scheduling and what-if runs every day, and you do not want a separate scheduling tool.
  • Your VISUAL data is clean and your customisations are light. An upgrade within VISUAL keeps your terminology, reports and people’s habits.
  • You use VISUAL’s wider set, such as Infor Quality Management or VISUAL Global Financials, and replacing all of them at once is too much change.
  • Your team has no capacity for a new ERP in the next 12 months.

ERPNext is a better fit when you want to own the system and the code, self-host or choose your hosting provider, avoid per-user licence growth as you add people on the floor, and your scheduling can work with workstation-based capacity planning and a clear daily dispatch list.

A practical plan for VISUAL 8 shops

Weeks 1 to 4: inventory

List VISUAL modules in use, customisations, macros, reports and integrations. Pull your current maintenance terms. Ask Infor or your VISUAL partner for a written upgrade quote and, if you want it, a cloud quote.

Weeks 4 to 10: fit test

Rebuild 20 representative parts in ERPNext: BOMs, routings and workstations. Release two weeks of real work orders. Record labour on Job Cards on one cell. Rebuild five closed jobs for costing. Score scheduling, costing, quoting and quality as standard, configure, build or no-go.

Week 11: decide

Compare five-year cost and risk for the VISUAL upgrade and ERPNext. Include scheduling (built-in, add-on tool or build) and report building in the ERPNext column.

Then: build, pilot, cut over

Load masters, run a conference-room pilot, train shop leads, then cut over at a month end. Finish open jobs in VISUAL where you can and keep it read-only for history.

Decision table

If this is true for youLean towardsWhy
Daily finite or DBR scheduling drives delivery promisesVISUAL upgrade, or ERPNext plus a scheduling toolERPNext plans against workstation hours, without a graphical finite scheduler
Simple routings, a dispatch list per machine is enoughERPNext worth pricingRoutings, Work Orders, Job Cards and capacity planning cover it
Must self-host or own the codeERPNextOpen source, runs on your servers or Frappe Cloud
Clean data, light customisations, happy with VISUALVISUAL upgradeLowest change for people and process
On VISUAL 9.0.8Plan now either wayInfor shows Extended Maintenance ending Dec 31, 2026

Best for, and wrong choice when

ERPNext is best for

Job shops with 20 to 200 people on VISUAL 8 or earlier who want to own their ERP, have moderate scheduling needs, and are ready to clean their part and Engineering Master data as part of the move.

A VISUAL upgrade is best for

Shops whose scheduling and costing practices are built around VISUAL’s scheduler and Manufacturing Window, with modest customisations and a team that knows the product.

ERPNext is the wrong choice when

Your delivery promises depend on DBR or finite what-if scheduling and you will not add a scheduling tool, you need a go-live within a few months with no time for a fit test, or nobody internally can own the system after go-live.

Frequently asked questions

When did Infor VISUAL 8 support end?

Infor’s VISUAL Product Lifecycle Policy (May 2023 edition) shows VISUAL 8.0.0 Mainstream Maintenance ended March 31, 2021 and Extended Maintenance ended March 31, 2023. Sustaining Maintenance continues, with an end date to be determined (checked Nov 17, 2026). An earlier 2018 edition showed Dec 31, 2019 and Dec 31, 2021.

What does Sustaining Maintenance include for VISUAL?

Access to pre-existing fixes and to Infor support, but no new product fixes, updates or regulatory enhancements. Infor says it may require an additional fee, at its discretion.

What about VISUAL 7 and VISUAL 9?

VISUAL 7.0 and 7.1 Mainstream ended Dec 31, 2017 with no Extended option. VISUAL 9.0.8 Mainstream ended Dec 31, 2024 and Extended ends Dec 31, 2026, per the same policy.

Is the VISUAL lifecycle policy an official Infor document?

Yes. It carries Infor’s branding, copyright and document code, and points to Infor’s support knowledge base for the current version. The copy we cite is hosted by an Infor partner because we found no public copy on infor.com. Check the current version in Infor’s support portal.

Can ERPNext replace VISUAL for a job shop?

Often, for shops with moderate scheduling needs. Parts, Engineering Masters, work orders and labour reporting map to Items, BOMs with Routings, Work Orders and Job Cards. Test scheduling first: ERPNext schedules against workstation hours and does not offer DBR scheduling.

How much does a VISUAL upgrade cost?

Infor does not publish VISUAL prices on the pages we checked. Ask Infor or a VISUAL partner for a written quote; we give no estimate.

What does ERPNext cost?

No licence fee (GPL-3.0). Frappe Cloud lists site plans from $5 a month and servers from $40 a month (about £3.78 and £30.25 at the Bank of England rate for Nov 13, 2026; checked Nov 17, 2026). Implementation is separate.

Should we migrate our VISUAL history?

Usually not. Move masters, open orders, stock and balances, and keep VISUAL read-only for closed work orders and labour history.

Still running VISUAL 8 or earlier?

We rebuild a sample of your Engineering Masters as ERPNext BOMs and routings, release a week of real work orders, and show you what the shop floor would see, so you can compare it with an Infor upgrade quote.

We'll get back to you shortly. We use your details only to reply to this request.